Oct 13 – 17, 2026
SARI, Shanghai, China
Asia/Shanghai timezone

Status of SHINE Cryomodules

Oct 14, 2026, 1:50 PM
20m
Conference Room 1, 4th floor (SARI, Shanghai, China)

Conference Room 1, 4th floor

SARI, Shanghai, China

Bldg. 10, No. 100 Haike Rd., Pudong District, Shanghai, China
Talk Accelerator and its related technologies for photon science Parallel A

Speaker

Jinfang Chen (Shanghai Advanced Research Institute)

Description

The SHINE Linac has been optimized to accelerate the beam to 8 GeV using 54 high-Q cryomodules (CMs). Mass production of high-Q cavities and CMs is currently underway. To date, approximately 450 high-Q cavities processed with mid-T baking or N-doping recipes have been fabricated and tested. The majority of these cavities have been assembled into CMs. Over 45 CMs have undergone testing; among them, 30 high-Q CMs have been installed in the Linac and are presently undergoing beam commissioning. This talk will present the performance of high-Q CMs and the lessons learned from their production.

Author

Jinfang Chen (Shanghai Advanced Research Institute)

Presentation materials

There are no materials yet.