The SHINE Linac has been optimized to accelerate the beam to 8 GeV using 54 high-Q cryomodules (CMs). Mass production of high-Q cavities and CMs is currently underway. To date, approximately 450 high-Q cavities processed with mid-T baking or N-doping recipes have been fabricated and tested. The majority of these cavities have been assembled into CMs. Over 45 CMs have undergone testing; among them, 30 high-Q CMs have been installed in the Linac and are presently undergoing beam commissioning. This talk will present the performance of high-Q CMs and the lessons learned from their production.